الوصف
Crosswalks at Ballard, Lincoln and Chestnut need painting. It is likely that this was not done due to the Lincoln Ave project which is now complete. Can we get this done soon?
Thank You
P. Manoogian
Precinct 10 TMM
Crosswalks at Ballard, Lincoln and Chestnut need painting. It is likely that this was not done due to the Lincoln Ave project which is now complete. Can we get this done soon?
Thank You
P. Manoogian
Precinct 10 TMM
7 تعليقs
تم إقراره DPW (تم التحقق رسميا)
R. Zizza (ضيف)
DPW (تم التحقق رسميا)
مغلق DPW (تم التحقق رسميا)
فتح Ronnie (مستخدم مسجل)
مغلق DPW (تم التحقق رسميا)
Ronnie (مستخدم مسجل)